533333巴黎人网址-首页|欢迎您

Overseas Projects Location : Projects > Key Cement Projects > Overseas Projects

Lafarge Philippines Iligan 1600t/d Preheater Debottlenecking EPC project

Lafarge Iligan cement plant was built in the late 1960s with preheater kiln and designed output was 1500t/d, however actual output was around 1400t/d. The system output was stably increased at above 1600t/d only after partial modification on preheater system and replacement of ID fan made by Nanjing Kisen. It only took 22 days from burning system modification to normal production, and created a technical modification mode with less investment and quick economic benefit.